Test EMC early

Find interference sources before the test laboratory does.

Indicative EMC measurements on machines, systems and control cabinets – directly at the development or installation site.

Greater confidence before conformity testing

EMC problems often only become visible during final laboratory testing. Pre-compliance measurements provide clarity earlier and help pinpoint critical frequency ranges and emission sources.

We support you with an indicative assessment of electromagnetic emissions and the search for technical causes. Filtering, shielding, cable routing or earthing can then be optimised before the final test cycle.

Measure early

Detect initial anomalies during assembly, integration or commissioning.

Locate sources

Systematically examine suspicious components, cables and control cabinet areas.

Evaluate measures

Assess technical changes transparently with before-and-after comparisons.

Prepare for testing

Reduce the risk of costly failed tests and unnecessary repetitions.

Suitable for

  • Machines, production systems and special-purpose machinery
  • Control cabinets, controllers and electrical assemblies
  • Prototypes, modifications and integration projects
  • Troubleshooting sporadic or load-dependent anomalies

Important context

Pre-compliance measurements are indicative measurements conducted during development. They do not replace standards-compliant conformity testing by a suitably equipped or accredited test laboratory, but they can prepare for it systematically and reveal technical risks much earlier.

CE process

Connect measurements with evidence documentation.

We integrate the results into the CE process and record measures transparently.